EasyManua.ls Logo

JLG EcoLift70 - Page 47

JLG EcoLift70
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION 4 - EMERGENCY PROCEDURES
3121740 4-3
3. Keep clear of platform as it descends.
4. Depending on the height of the elevated platform, it
may be necessary to extend the shaft of the lowering
tool.
5. Turn the shaft lock counter-clockwise to extend and
retract the lowering tool shaft, and clockwise to lock
to the desired position.
NOTE: Step 4 & 5 are applicable only for EcoLift 70.
Figure 4-1. Emergency Lowering Tool (EcoLift 50)
Figure 4-2. Emergency Lowering Tool (EcoLift 70)
Discount-Equipment.com

Related product manuals