FORM 160.72-CL1 (810)
York oM optiView Controls retrofit point-to-point CheCklist
*TO: ___________________________________ JOB NAME: ____________________________
_______________________________ LOCATION: __________________________
_______________________________ CUSTOMER ORDER NO. ______________
YORK TEL. NO. __________ YORK ORDER NO. ________ YORK CONTRACT NO. ________
Month Day Year
CHILLER
MODEL NO. _______________________ SERIAL NO. ______________________________
The work (as checked below) is in process and will be completed by _____________ / _____________ / _____________
Model – titan
General
Field devices are installed and external control wiring to control panel completed in accordance with
YORK wiring diagrams
Control power supply available
Pneumatic control piping completed and supply and control air pressure available
analoG inputs
deViCe desCription pass
CT-1,2,3 Compressor Motor Current Transformers
LT-114 Subcooler Refrigerant Liquid Level
PT-111 Evaporator Refrigerant Pressure
PT-113 Compressor Discharge Pressure
PT-115 Intercooler Refrigerant Pressure
PT-140 Compressor Supply Oil Pressure
PT-143 Compressor Sump Oil Pressure
PT-144 Compressor Shaft Pump Oil Pressure
PT-146 Compressor Balance Piston Pressure
PT-147 Compressor Thrust Bearing Oil Pressure
PT-150 Gear Supply Oil Pressure
PT-156 Gear Shaft Pump Oil Pressure
PT-180 Supply Air Pressure
TT-100 Chilled Water Leaving Temperature
TT-101 Chilled Water Entering Temperature
TT-102 Condenser Water Entering Temperature
TT-103 Condenser Water Leaving Temperature
TT-106 Intercooler Refrigerant Liquid Temperature
TT-111 Evaporator Refrigerant Liquid Temperature
TT-112 Compressor Suction Temperature
TT-113 Compressor Discharge Temperature
TT-114 Subcooler Refrigerant Liquid Temperature
TT-115 Condenser Refrigerant Liquid Temperature
TT-140 Compressor Supply Oil Temperature
TT-142 Compressor Shaft End Bearing Oil Return Temperature