EasyManua.ls Logo

Johnson Controls York Smart Equipment SC-EQ - SC-AP Cable Installation

Johnson Controls York Smart Equipment SC-EQ
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JOHNSON CONTROLS
38
FORM 450.50-N1
ISSUE DATE: 08/19/2019
SECTION 4 - SC-AP GATEWAY
LD20434
LD20435
FIGURE 44 - SC-AP CABLE TY-WRAPS
FIGURE 45 - SC-AP & SC-EQ INSTALLED
DIN RAIL & Velco Panel Mount (Cont'd)
5. Install one ty-wrap mount (p/n 025-25155-000)
above the ribbon cables and one below to retain
the coiled cable using two ty-wraps (p/n 025-
18167-000), as shown in Figure 44 on page 38.
6. Install the coiled SC-AP cable by plugging one
end into the SC-EQ CS RJ Port J1 and the oth-
er end into the SC-AP 6-pin RJ-12 connector.
Caution: Do not plug the SC-AP cable in to the
SC-EQ BAS RJ jack as this exposes the wrong
equipment to the SC-AP.
7. Install the two ty-wraps in the ty-wrap mounts to
hold the coiled cable, loosely tighten the ty-wrap
and trim off the excess ty-wrap ends.
8. The installed SC-AP and SC-EQ should look sim-
ilar to Figure 45 on page 38
FIGURE 43 - SC-EQ TO SC-AP CABLE
LD21043

Table of Contents

Related product manuals