8.4 REPLACEMENT OF MAJOR PARTS
ņ42
8
yyyy
yyyy
Stay
Step 11: Close the upper housing.
Before closing the upper housing, check that
the packing has no abnormality, such as
deformation or cracks.
Also, remove foreign material and dust if
attached.
Close the upper housing while pulling the
center of the stay.

If any hexagonal bolt is not tightened enough
or is loosened, the waterproof performance may
be deteriorated. Be sure to tighten all bolts
with specified torque (120 to 150kgf·cm).
 When closing the housing, be careful
 that the cables are not caught.
 When closing the upper housing, always
 pull the center of the stay. Otherwise the
 stay may be broken.

After the work, turn "ON" the safety switch.
This completes the magnetron replacement procedure.