M5i | M5 STRIDER ELLIPTICAL
08
UNPACKING
1
2
3
1. Open the Shipping Box by cutting along the dotted
line using Safety Box Cutters.
2. Cut all the Straps that attach the equipment to the
Shipping Box base using Scissors.
3. Release the Handlebars and the Loose Parts package
by cutting the Cable Ties using Scissors.
4. Release the (a) Top Frame from the wood base and
remove the bracket from the Top Frame. Then,
release the (b) Pedal Mount and (c) Pedal Hangers.
Tools: 13 mm Socket and Ratchet, 13 mm Wrench,
and 11 mm Wrench. Discard the bolts/washers and
bracket, they are not required for assembly.
4
a
c
b
HEAVY OBJECT: Help required when lifting. Position the shipping box in a cleared area. Follow unpacking steps 1–4 below.
11 mm
13 mm
13 mm