EasyManuals Logo

KERN EOB Operation Instructions

KERN EOB
22 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #17 background imageLoading...
Page #17 background image
EOB/EOE/EOB/EOS/BOBP-BA-e-0620
17
7.2.3 Mounting instructions for using wall bracket
7.3 Mains supply
Electric power supply is by means of the external mains supply circuit. The printed
voltage level must comply with the local voltage.
Only use original KERN mains supply circuits. The use of other makes is subject to
approval by Kern.
7.4 Battery Operation
Remove the battery cover underneath the display. Connect 6 x 1,5V round cells. Re-
insert the battery cover.
Battery conservation through automatic power-off 3 minutes after ending a weighing
operation.
When the battery power is used up the display will show “LO“. Press the OFF key
and change the batteries at once.
When the balance is not in use for a longer period of time remove batteries and keep
them separately. Leakage of battery liquid might damage the balance.

Other manuals for KERN EOB

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the KERN EOB and is the answer not in the manual?

KERN EOB Specifications

General IconGeneral
InterfaceRS-232
CalibrationExternal calibration
Weighing range [Max]6 kg
Permissible ambient temperature5 °C/35 °C
MaterialPlastic
Readability0.1 g
Reproducibility0.1 g

Related product manuals