EasyManua.ls Logo

Kirsch Cellular Shade Series - Page 13

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
INSTALLATION
INSTALLATION
■
Drill the pilot hole using a
3
∕
32
" drill bit and attach the bracket using the screw provided.
IMPORTANT: Do not over tighten the screw.
STEP 4 — Install the Bracket Cover
■
Slide the bracket cover over the magnetic hold-down bracket and mark the screw hole.
■
Remove the bracket cover once the screw hole is marked.
■
Drill the pilot hole using a
3
∕
32
" drill bit and slide the bracket cover back over the magnetic hold-down bracket.
■
Attach the cover using the screw provided.
IMPORTANT: Do not over tighten the screw.
STEP 5 — Place and Attach Second Bracket
■
Repeat steps 1 through 4 to install the second magnetic hold-down bracket.
IMPORTANT: Make sure the bottom rail is level when marking the second bracket location.
STEP 6 — Final Adjustments
■
Verify that the bottom rail is level.