25
ۣૐ ۞ইૐҴૐ ೠҴসӏѺ ಿ҃మ
5.5.9FittingtheCoaxialFlue(Ø60/Ø100-VerticalFlueSystem)
▪Theverticaluekitissuppliedwithaspeciallydesigned
weatherproofterminaltted,itcanbeusedeitherwithaat
rooforapitchedroof.
▪Beforeproceedingtottheue,ensurethatthemaximum
uelengthhasnotbeenexceeded20metersandthatall
elbowsandbendshavebeentakenintoconsideration,
foreachadditional90°elbow1metermustbesubtractedfrom
thetotaluelength,andforeach45°0.5metersmustbe
subtractedfromthetotaluelength(theheightofthevertical
adaptoranda45°bendcanbeseeninbelowphoto.)
▪Markthepositionoftheueholeintheceilingand/orroof.Drill
a130mmdiameterholethroughtheceilingand/orroofandt
theashingplatetotheroof.
▪Toconnecttheverticaluekitdirectlytotheboiler,place
theverticalstarterkitontothetopoftheboilerandsecure
withtheclamp,ttheverticaladaptorontothevertical
starterkit.Thereisnoneedtouseaclamptosecurethis
asitisapushtconnection,theverticaluekitmustthen
beinsertedthroughtheroofashing,thiswillensurethatthe
correctclearanceabovetheroofisprovidedastheterminal
isaxedheight.
▪Shouldextensionsberequired,theyaregenerallyavailable
in1meteror500mmandtheymustbeconnecteddirectly
totheverticalstarterkitbeforeconnectingtheadaptor
toallowtheverticaluekittobetted.Intheeventthat
extensionpiecesneedtobeshortened,theymustonlybe
cutatthemaleendanditmustbeensuredthattheinner
andouterueremainush.
▪Whenutilizingtheverticaluesystem,actionmustbetaken
toensurethattheueissupportedadequatelytoprevent
theweightbeingtransferredtotheapplianceueconnection
byusing1uebracketperextension.
▪Maximumpermissibleequivalentuelengthsarebelow
example,
MAX.20M
Drill hole 130mm
- C
33
VerticalFlueSystem
ExtensionVentTerminal:1Mor500mm
Max.Length=A+B(1X45ºelbow)=20-1.0=19.0M
A
B
- Calculation C
33
FlueLength