28
ۣૐ ۞ইૐ઺Ҵ ೠҴ࢑সӏѺ ಿ૕҃৔మ
5.7 Preparing the Wall
▪Afterconsideringthelocationpositiontoensuringitislevel
bothhorizontallyandvertically.
▪PleaserefertothetemplatebeforeinstallingtheCombi
boiler.
•Attachthetemplateexactlytothelocationwhereyouwantto
installtheappliance.
•Drill12mm(0.47inch)4holesatthepositionoftemplate
bracketwhichisappropriateplaceforinstallingtheheater.
•Afterfouranchorboltsinsertedintheholes,mountthewall
bracket.
CAUTION
Theboilerisheavy.Alwayslifttheunitwithassistance.
Becarefulnottodroptheboilerwhileliftingorhandlingit
toavoidbodilyinjuryordamagetotheunit.
5.8 Heating System Filling and Pressurizing
▪Whenconnectingthespaceheatingsystem,followthese
guidelines:
-Tightentheconnectionvalveswithcaretoavoiddamage.
-Testtheboilerforproperspaceheatingowandinspectfor
leaks.
▪Allingpointconnectionislocatedonthebottomsideof
theboiler,rstopenthehandleitandthenwatercomes
intoheatingsidefromDHWside.Atthistime,installermust
conrmproperlypressureinheatingsidetoworking.
Afterthat,primaryinstallinghastodothisoften,sincemight
benotenoughlledwater.
▪Allingloopdoesn’tsuppliedwiththeboiler.
Then,ifyoursiteshouldbeinstalledallingloop,mustbe
installeditwithqualiedtechnicalperson.Also,shouldbe
followedthelocalcodes.
▪Thellingmethodadoptedmustbeinaccordancewith
allrelevantwatersupplyregulationsanduseapproved
equipment.
5.9 DHW System Filling
▪Closeallhotwaterdrawofftaps.
▪Openthecoldwaterinletcock.
▪Slowlyopeneachdrawofftapandclosethemonlywhen
clearwater,freeofbubbles,isvisible.
▪AllDHWcircuits,connections,ttings,etc.shouldbefully
inaccordancewithrelevantstandardsandwatersupply
regulations.
▪Theboiler’smaximumworkingmainspressureis10bars,
thereforeallpipework,connections,ttings,etc.,should
besuitableforpressuresinexcessof10bars.
Apressurereducingvalvemustbettedforpressuresin
excessof10bars.Themanufacturerofanyoutletttings,
suchasashowervalve,mayrequirealowermaximum
pressure.Thepressurereductionmusttakeaccountofall
ttingsconnectedtotheDHWsystem.
•Afxthewallbracketsecurelytothewall.
Makesurethatitislevelanditcansupporttheweightofthe
Combiboiler.