DocumentNo.:KE-4025-06 16/50
ManualOperationMethodofB-5toB-7ActuatorsManualOperationUnit
DONOTinsertyourfingerinpinholeofthemanualoperationunit.Astrong
forceisappliedtotheinternalparts.
DONOToperatethevalveautomaticallywhileapinisinsertedintothepin
hole.Itmaydamagethemanualoperationunit.
Insertthepinintothepinholecompletelyformanualoperation.Themanual
operationunitwillbedamagedifthepinisinsertedhalfway.
Whenthevalveisoperatedautomatically,makesuretoinsertaplugintothe
pinhole.Withoutplug,rainwater,dust, etcwill enterthe manualoperation
unitandcorrodetheinterior.
(1) ManualOperation
① Stopsupplyingairtotheactuator.
② Openthepressureequalizingvalve.
③ Removetheplug.
④ Adjusttheindicatorpositiontothepinholebyrotatingthehandle.
⑤ Insertthepinintothepinholecompletely.
⑥ Operatethevalvewiththehandle.
(2) AutomatedOperation
① Removethepinformthepinhole.
(Ifthepinisnoteasilyremoved,rotatethehandlealittletofreethepin.)
② Inserttheplugintothepinhole.
③ Closethepressureequalizingvalve.
④ Supplyairtotheactuator.