17 of 30 DI-129/11/07.07.15
USA
OPERATION
IMPORTANT !!!
Before starting shredding operation and before any material is introduced into the Cyclone the
following points must be carefully checked:
1. When the “START” button is pressed the Cyclone main motor starts and the
plastic bag must be inflated by the airflow.
2. The Cyclone will shut itself off automatically after approximately 30-40 seconds
when empty and when the tuning and setup procedure at the end of this
operations manual is done correctly if needed.