TP-6803 12/11 29Section 1 Installation
1.8.7 Connect Opt ional Programmable
Interface Module (PIM)
The optional programmable interface module (PIM)
provides two programmable inputs and six dry contact
outputs, four of which are programmable. See TT-1584
for PIM installation and connection instructions.
1. Output connections (3 terminal blocks, 6 outputs)
2. Input connections (2 inputs)
3. Rbus communication connection to generator set terminal
block TB1
2
ADV-8199
1
3
1
1
Figure 1-27 Optional PIM
The default settings for the inputs and outputs are
shown in Figure 1-28. To change the input and output
settings, use a personal computer running Kohlerr
SiteTech software. See TP-6701, SiteTech Software
Operation Manual, for instructions.
A personal computer running Kohlerr OnCuet
software can be used to actively control PIM outputs.
See the OnCue Software Operation Manual for
instructions.
PIM Connection Factory Default Setting
Input 1 None
Input 2 None
Output 1 (Relay 1) Run
Output 2 (Relay 2) Common Fault
Output 3 (Relay 3) Low Battery Voltage (Program-
mable)
Output 4 (Relay 4) Not in Auto (Programmable)
Output 5 (Relay 5) Cooldown (Programmable)
Output 6 (Relay 6) Normal Source Failure (Program-
mable)
Figure 1-28 PIM Inputs and Outputs
1.8.8 Connect Opt ional Load Control
Module (LCM)
The optional load control module (LCM) provides an
automatic load management system to comply with
Section 702.5 of NEC 2008. Refer to TT-1574, provided
with the LCM, for installation and connection
instructions. The installer is responsible for ensuring
that the power system installation complies with all
applicable state and local codes.
The load control module automatically manages up to
six residential loads. Four power relays are provided for
management of non-essential secondary loads, and
two relays are available to control two independent air
conditioner loads.
Two kits are available with either a prewired harness for
load relay connection, or a terminal block. The prewired
harness requires installation of the LCM within 2 feet of
the distribution panel.
Figure 1-29 Optional Load Control Module (LCM)
(shown with optional pre-wired harness)