System Start-up Checklist
Date System Installed: / /
Installer and Address:
Phone Number: ( ) -
Start-Up Service Agency:
Phone Number: ( ) -
Freezer Condensing Unit
Inspection Feature
Data
Accept
Reject
Action Required
Model Number:
Serial Number:
Electrical Volts:
Electrical Phase:
Amperage @ L1:
Amperage @ L2:
Amperage @ L3:
Ambient Temp:
°F
Comp. Discharge Pressure:
PSIG
Comp. Suction Pressure:
PSIG
Suction Line Temp @ Comp.:
°F
Discharge Line Temp @ Comp.:
°F
Comp. Superheat:
°F
Defrost Setting (4 day/45 min):
All electrical connections are tight:
Unit base properly supported:
Fans Running & No Vibration:
All guards, covers attached:
Refrigerant Sight Glass Clear:
Comp. Oil Level @ ½ Sight Glass:
Comp. Mounting Clips Removed:
Suction line insulated fully and properly supported:
Freezer Evaporator
Inspection Feature
Data
Accept
Reject
Action Required
Evaporator installed with nylon bolts with proper
airflow clearance:
Model Number:
Serial Number:
Electrical Volts:
Electrical Phase:
Suction Line Temp @ Evap:
°F
Evap Superheat:
°F
Thermostat Set:
°F
Operating Temp:
°F
TXV Bulb Properly Mounted:
All guards, covers attached:
All electrical connections are tight:
Defrost Heater Amp Draw:
A
Freezer Piping
Inspection Feature
Data
Accept
Reject
Action Required
Suction Lines Insulated:
Oil Trap at Base of Suction Riser:
Copper Drain Lines Sloped Min 1/2” ft:
Piping Supported Every 5’:
Copper drain line heater attached, working, and
insulated:
Copper Drain Line Trapped Outside Freezer
Space: