Kracht GmbH Maintenance | 9
88046020002 41 / 46
9.4 Maintenance table
9.4.1 Maintenance table
Firstly:after max. 24 h
Daily
3000 Operating hours
6000 Operating hours
As required
Additional information
9.4.2 Inspection: Discharge flow 2
9.4.3 Inspection: Operating
pressure
2
9.4.4 Inspection: Media temper-
ature
2
9.4.5 Inspection: Condition of
operating fluid
2
9.4.6 Audiometric monitoring:
Unusual noise
1
9.4.7 Cleaning 1
9.4.8 Visual inspection: Leakages 1
9.4.2 Inspection: Discharge flow 2
9.4.3 Inspection: Operating
pressure
2
9.4.4 Inspection: Media temper-
ature
2
9.4.5 Inspection: Condition of
operating fluid
2
9.4.9 Visual inspection: Measur-
ing unit status
3
9.4.10 Visual inspection: Condi-
tion of housing parts
3
9.4.11 Visual inspection: Bearing
status
3
9.4.12 Replace: Other seals 4
9.4.13 Cleaning Desposits in the
measuring device
4
1 - 0,1 h; 2 - 0,2 h; 3 - 0,3 h; 4 - 0,5 h