3 INSTALLATION
20
VA FLOWMETERS
www.krohne.com 09/2022 - 4000419908 - AD VA Mech Ex Gb-Db R08 en
Figure 3-6: Ground terminal for VA40
Figure 3-7: Groun
d terminal for GA24
INFORMATION!
The grounding ① and
② are equivalent.
INFORMATION!
The temperature at the electrostatic equalisation connector on the DK32, DK34 and DK37
measu
ring units corresponds to the process temperature. It is thus the responsibility of the
operator to select the connecting cable according to the process temperature.