RPH
3
Index
Section Page
Abrasive fluids 6.2.4 12
Accessories 4.4 8
Aligning the pump / drive 5.3.1 9
Auxiliary connections 5.4.1 10
Bearing bracket B 06, cooled/uncooled 9.2 22
Bearings 4.3.4 7
Checking the direction of rotation 2.9.3/
6.1.4
5/
11
Checks to be carried out prior to installation 5.2 8
Cleaning the plant piping 6.1.5 11
Clearances 7.5.5 17
Commissioning 6.1 10
Commissioning, start-up / shutdown 6 10
Connecting the piping 5.4 10
Connection to power supply 5.6 10
Coupling guard 5.4.2 10
Density of fluid pumped 6.2.3 12
Description of the product and accessories 4 6
Design details 4.3 6
Design variants 9.3 23
Designation 4.2 6
Dimensions and weights 4.5 8
Dismantling 7.4 14
Dismantling (general) 7.4.2 14
Drainage / d isposal 7.3 13
Explosion protection 2.9 5
Final check 5.5 10
Fundamental instructions and
recommendations
7.4.1 14
General 1 4
General assembly drawings/lists of
components
9 21-24
General instructions 7.1/
7.5.1
13/
14
Impeller 4.3.2 7
Installation at site 5 8
Installing the pump / unit 5.3 9
Interchangeability of pump components 7.6.2 19
Interim storage/Preservation 3.2 6
Lubricants 6.1.1 10
Lubrication and lubricant change 7.2.2 13
Maintenance 2.9.6 6
Marking 2.9.2 5
Marking of instructions in the manual 2.1 4
Material class S, cooled/uncoooled 9.1 21
Measures to be taken for prolonged
shutdown
6.3.2 13
Mechanical seal installation 7.5.4 16
Minimum/Maximum Flow 6.2.5 12
Section Page
Noise characteristics 4.3.6 8
Non-compliance with safety instructions 2.3 4
Operating limits 6.2 12
Permissible forces and moments at the
pump nozzles
4.3.5 7
Personnel qualification and training 2.2 4
Place of installation 5.3.2 9
Priming the pump and checks to be carried
out
6.1.3 11
Pump casing 4.3.1 6
Pump operating mode 2.9.4 5
Reassembly 7.5 14
Reassembly (general) 7.5.2 15
Recommended spare parts stock for
2 years’ operation
7.6.1 18
Returning to service after storage 6.4 13
Safety 2 4
Safety awareness 2.4 4
Safety instructions for maintenance,
inspection and installation work
2.6 5
Safety instructions for the operator / user 2.5 4
Safety regulations 5.1 8
Servicing / inspection 7.2 13
Servicing / maintenance 7 13
Shaft seal 4.3.3/
6.1.2
7/
11
Shutdown 6.1.8 12
Shutdown / Storage /
Preservation
6.3 12
Spare parts stock 7.6 18
Start-up 6.1.7 12
Start-up strainer 6.1.6 11
Storage of new pumps 6.3.1 12
Supervision of operation 7.2.1 13
Switching frequency 6.2.2 12
Technical specification 4.1 6
Temperature limits 2.9.5 5
Temperature of fluid handled / ambient
temperature
6.2.1 12
Tightening torques 7.5.3 15/16
Transport 3.1 6
Transport and interim storage 3 6
Trouble-shooting 8 20
Unauthorized modes of operation 2.8 5
Unauthorized modification and manufacture
of spare parts
2.7 5
Unit fill 2.9.1 5