2 SETUP 3
2.1 Unpacking and setting up the vehicle
Preparatory work
– Remove the box.
S01841-10
Main work
– Remove the adhesive tape in the upper area of the motorcycle.
S01842-10
– Roll down the film at the sides.
Info
To avoid damaging the motorcycle during unpacking, leave the other films
on the vehicle until you have finished work on the vehicle.
– Remove the separate enclosure and unpack it. Check the separate enclosure for
completeness.
– Check the vehicle for transport damage.
S01843-10
–
Remove cable tie(s)
1
.
–
Remove screws
2
and
3
.
– Take off the controls from the transport holder.
S01844-10
–
Disconnect connector
4
.
–
Remove screw
5
.
– Take off the combination instrument support from the transport holder.
S01845-10
–
Remove the handlebar clamp screws
6
.
– Take off the handlebar clamp and transport holder.
– Remove packaging on the right turn signal.