EasyManua.ls Logo

KUHN EL22 - Putting into service; Coupling and Uncoupling Procedures

KUHN EL22
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rotary cultivators
20
EL22
Putting into service
$Putting into service
1. Coupling and uncoupling
Description of coupling elements
- A PTO shaft 1 3/8’’ - 6 splines.
- A 3-point hitch.
Preparing the tractor
The machine adapts to tractors fitted with a 3 point
linkage category 1.
The tractor nominal PTO speed must be 540 min
-1
.
Hitch pin parallelism
Adjust tractor lift rods so that hitch pins are parallel to the
ground.