Power harrows
66
HRB353D - 403D
Optional equipment
Parking
Instructions for transport
Putting the machine into transport position
From the working position:
- Remove the hydraulic attachment stroke limiter chain.
- Uncouple the PTO shaft (between the power harrow
and the additional machine).
- Completely raise the hydraulic lift linkage.
- Fit safety plate (1).
- Insert and secure lynch pin (2).
Maintenance
Every 100 hours
Grease:
- Pivot points.
When parking the power harrow/additional
machine unit, make sure that the additional
machine is lowered first.