Maintenance and storage
Power harrows
HRB353D - 403D
75
Maxipacker roller : (b)
• Unscrew the 7 nuts (1).
• Remove the 3 tensioning devices (2).
• Slide lever in sleeves (3).
• Pivot scraper bar using lever.
• Clean and reassemble the unit.
Tightening torque: (1) 22 daN m (162 lbf ft)