Machine use
Control box
RPB
53
î
Sequential opening/closing of the spraying
sections
Left sequential opening of the spraying sections:
- Operate switch (1) to the right.
- Repeat procedure for each section.
Left sequential shutting of the spraying sections:
- Operate switch (1) to the right.
- Repeat procedure for each section.
1
1