Gather all of the following tools and materials.
You will need these tools to complete the
installation.
•Adhesive tape
Eye protection
•Pencil
•Scriber
Light hammer
Center punch
3.75" (95 mm) hole saw
Electric drill
5/8" (16 mm) drill bit
File
•75RG-6 and/or RG-11 RF coax cables
and F-connector installation tools (see
“Cable Requirements” on page 10)
Snap-N-Seal
®
F-connectors (or
equivalent)
Silicone sealant (or equivalent)
•Heat shrink gun
Wire strippers
Wire crimpers
#1 Phillips screwdriver
5/32" hex key
7/16" open-end torque wrench set to
20 in-lbs (2.25 N-m) of torque
7/16" socket/ratchet or nut driver
1/2" open-end wrench
3/4" socket/ratchet or wrench
3/4" socket/torque ratchet capable of
settings between 35 and 40 ft-lbs (47 and 54
N-m) of torque
Voltmeter
Isolation transformer, if required (see “AC
Power Requirements” on page 11)
PC (preferably with Internet access)
•X-ACTO
®
knife
Needle-nose cutting pliers
Ruler or tape measure
NMEA interface cable (for heading input)
Gather Tools
2

Other manuals for KVH Industries TracVision HD11

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the KVH Industries TracVision HD11 and is the answer not in the manual?

KVH Industries TracVision HD11 Specifications

General IconGeneral
BrandKVH Industries
ModelTracVision HD11
CategorySatellite TV System
LanguageEnglish

Related product manuals