EasyManua.ls Logo

Laars NTV1000 - Page 3

Laars NTV1000
140 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LAARS Heating Systems
Section 9 –
SETUP AND CONFIGURATION ............................ 44
9.1 ReviewofLead/LagControlSystem ...... 44
9.1.1 AboutLead/LagOperation ..................... 44
9.1.2 Lead/LagModulationCycle .................... 45
9.1.3 NTHLead/LagwithIndirect
DomesticHotWater ................................ 46
9.2 ConnectionTerminals ............................. 46
9.3 NeoThermLCSystemCongurations .. 46-54
9.4 Installation Jobs ...................................... 55
A NoteforSystemsUsingCommon
Venting .................................................... 55
B NamingtheControllers ........................... 55
C MakeOneControltheLead/Lag
Master ..................................................... 56
D DisabletheLead/LagMasterFunction
ontheLead/LagSlaves .......................... 57
E Set up the Modbus Control Addressing .. 58
F Set the Flap Valve IDs ............................ 59
G Disconnect Unused Operator
Interfaces ................................................ 63
H Connect the Modbus Wiring ................... 63
I SettheParametersUsedbythe
Lead/LagSystem .................................... 64
Aboutthe“TimeofDay”Function ........... 68
J InstalltheSystemSensorandAdjust
the Setpoint ............................................ 68
K SettheLead/LagOutdoorResetand
WarmWeatherShutdown ....................... 68
About“OutdoorReset” ........................... 69
L BuildingAutomationorMultipleBoiler
ControlThermostatDemand ................. 70
M BuildingAutomationorMultipleBoiler
4-20mASetpointControl ....................... 70
N BuildingAutomationorMultipleBoiler
4-20mAModulationControl .................... 71
O CombustionSetupProcedure ................ 71
P SettingtheDateandTimeonthe
SystemDisplay ....................................... 76
9.5 SetupforDomesticHotWaterona
Lead/LagSystem .................................... 77
Setup Type 1 ........................................... 77
Setup Type 2 ........................................... 78
Setup Type 3 ........................................... 79
9.6 Gateway Connections to a
BuildingAutomationSystem ................... 80
9.7 Setup for High Altitude Operation -
NT 1700 Only .......................................... 80
9.8 InstallerParameters .......................... 81-87
Section 10 -
INITIAL STARTUP INSTRUCTIONS ...................... 88
10.1 FillingtheBoilerSystem ......................... 88
10.2 Initial Operation ...................................... 89
10.2.1 Initial Burner Operation ........................... 89
10.2.2 CombustionSetupProcedure ................ 89
10.3 ShuttingDowntheNeoThermLC ........... 89
10.4 RestartingtheNeoThermLC .................. 89
Section 11
MAINTENANCE ..................................................... 90
11.1 SystemMaintenance .............................. 90
11.2 Maintenance Notes ................................. 90
11.2.1 Burner ..................................................... 90
11.2.2 ModulatingGasValve/Venturi ................ 90
11.2.3 Controllers .............................................. 91
11.2.4 IgnitorAssembly ..................................... 91
11.2.5 FlameSensor ......................................... 91
11.2.6 TransformerwithIntegral
Circuit Breaker ........................................ 91
11.2.7 Blower ..................................................... 92
11.2.8 Heat Exchanger Coils ............................. 92
11.2.9 Gas Pressure Switches (optional) .......... 92
11.2.10Natural/PropaneGasConversion ......... 93
11.2.11 Condensate Trap .................................. 93
11.2.12 Battery(Date&TimeBack-Up) ............ 93
Section 12
TROUBLESHOOTING ........................................... 94
12.1 Potential Setup and Synchronization
Problems ................................................ 94
12.1.1 Controller Synchronization ..................... 94
12.1.2 Flap Valve Status Checks ....................... 95
12.2 About Lockouts, Holds, and Alerts .......... 95
12.2.1 Responding to a Lockout, Hold,
or Alert .................................................... 95
12.2.2 Viewing the Lockout and Alert
Histories .................................................. 96
12.3 Troubleshooting Tables (all codes)......98-112
12.4 DiagnosticTestsandInput/Output
Indicators ...............................................113
12.5 Lead/LagSlaveDiagnostics ..................114
12.6 Statistics ................................................114
12.7 Analysis .................................................114
12.8 Control Snapshot ...................................115
12.9 Operating Sequence .............................. 115
Section 13
REPLACEMENT PARTS .......................................118
13.1 GeneralInformation ...............................118
13.2 Parts List ................................................118
13.3 Parts Illustrations .................................. 124
ii

Table of Contents

Other manuals for Laars NTV1000

Related product manuals