Single Line Reefing Instructions
Reefing line Routing
from Starbo rd sheaves
t & GNAV.
boom will angle
p until all of the aft reefing line slack is
3. Ease the halyard, and continue pulling
the reefline. The boom outer end will
e clew
nd tack down hard, jam it off.
just the
NAV & sheet.
Method
1. Ease shee
2. Pull the reefline. The
u
taken in or GNAV travel limit is reached.
move down towards horizontal.
4. When the reefline has pulled th
a
5. Re-tension the halyard and ad
G
B
Lines exit boom ends
a
Secure aft reefing line
around the boom
end
using a
Place
forward
line
ide
nd
reefing
end
in the
Port s
boom e
notch.
Reefin
line
Outhaul
(Port)
Forward
Boom
End
Aft/Rear
End
oom
21