Initial Set-Up
Pre-Operation Equipment Inspection Checklist
Initial Set-Up Lastec//021819 3-13
3
3.11 Pre-Operation Equipment Inspection Checklist
Perform the following equipment inspection prior to each operation of the Articulator.
With the tractor and Articulator parked on level ground, verify that the Articulator is properly mounted
to the tractor and secure.
Verify that the PTO shaft is properly mounted, and the shield retaining chains are secure.
Verify that your cutting application falls within the proper PTO shaft range.
Check the oil level in the gearbox.
Inspect area around and under the gearbox for any oil leakage.
Check the deck drive belts and idler tension springs for proper installation, tension and condition.
Check all deck belts and idler tension springs for proper installation, tension and condition.
Clean the entire deck area (including the underside of all belt covers) of all grease, oil, fuel, and grass
debris. Be sure to replace all covers, guards and shields.
Inspect all blades for proper installation, orientation, tightness, sharpness, and overall condition.
Set the mower deck height to the desired level.
Verify proper function of all gauge wheels.
Verify that all warning decals are in place, visible and legible.
Verify that all covers and safety devices are properly installed and secure.
Check that the discharge chute is clear of debris, properly mounted, and in good condition.
Inspect entire Articulator for loose or entangled parts, debris, obstructions, or neglected tools.
Perform all safety, set-up, and pre-operation procedures listed in your tractor manual.
Complete the appropriate maintenance checklist (section 5).