Maintenance manual for technical assistance - LB 2800 - LB 2810
Manual code 10066574 / Rel. 0.00 / March 2009
26
Perforator and capsule holder gasket
Every 4 months, check and replace some components of the group, if necessary:
- unscrew the screw (A);
- unscrew the ring (E);
- remove the spring (B);
- replace the perforator (C);
- replace the seal (D);
- replace the seal (F);
- replace the undercup seal (G).
Machine
Using the pressure gauge of the machine, check that the pressure in the boiler is about 0.8 - 1.2 bar.
9. CHECKS AND MAINTENANCE
To ensure perfect safety and efficiency of the appliance over time, it is necessary to carry out routine, preventive
a
nd special maintenance. In particular, it is advisable to carry out an overall check of the machine at least once
a
year.
Weekly checks
Monthly checks
Warning
Be sure to use only original spare parts.
G
F
E
D
C
B
A