34
ENGLISH
QU
ICK STEPS TO OPERATIONALIZE INSTALLATION
Once you have run the wiring and bridged, if necessary (LD5 L
D6, and LD2 should always be switched on), perform the procedure below
in order to operate the gate:
1.
Make sure the operator is connected on the Terminal Board J3 to the terminals 4-5-6 with its capac
itor;
2. Conn
ect the control unit to the mains;
3.
Store at least 1 remote control (page 30). Attention: If the STOP button is not installed, bridge the terminals 10 and 12 on the Termina
l
Boar
d J4, otherwise no remotes can be inserted
.
4.
Check correct polarity of the connected motor: manually release the operator and position the gate halfway. Lock the operator. Gi
ve the
start command w
ith the remote control: the first command after a power outage is always an opening. In case of closure, reve
rse
the motor terminals conn
ection 4-5 on J3 terminal board;
5.
Place the magnetic switches on the rack, according to the table below
:
6.
If the gate does not run, check the connection of safety devices, capacitor and possibly Bridge all contacts NC (normally closed,
LD5 LD6, and LD2 should always be switched on), and try again.
7. PR
OGRAMMING
Unlock the operator and place the gate in closing. Lock the operator.
Refer to the instructions page 30 of this manual
8.
Set up the logic (step-by-step, automatic, condominium) and pause time as at page 31 of this manual, thrust with RV1 (slow-down speed
is set with RV1 but only during programming) and other customizatio
ns.
I) QUICK START GUIDE
POSITION
LED STATE
OF THE GATE LD3 LD4
Opened
ON off
Closed off ON
Midw
ay
ON ON