EasyManua.ls Logo

Leigh rtj400 - Page 58

Leigh rtj400
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5858
RTJ400 User Guide
Box Joint Procedures - 3/4"
Chapter 11
11-27 If the joint is over flush, lower the bit to suit. If the joint
is under flush, raise the bit to suit. Rout a fresh test joint until fit
and flushness are perfect before routing the actual workpieces.
A
A
11-26
Theoretically, there will be nothing left in the sockets,
where the bit has passed by twice. However, routing tolerances
can leave a very thin “wall”
A
. This can be quickly removed with
a chisel, file, or knife.
OVER FLUSH UNDER FLUSH

Related product manuals