EasyManua.ls Logo

Lelit PL92T - First Start-up; Initial Setup and Power On; Hydraulic Circuit Filling

Lelit PL92T
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Elizabeth - PL92T
10
8. First start-up
8.1 8.2 8.3
ON
Place the machine on a solid, at and dry surface and make sure the appliance
is stable.
Remove the carton protections and the equipment box placed under the brewing
group. Extract the power cord (J) and the cups raiser (E) from inside the water
drip tray (15).
Fill the water tank (9) with room temperature water up to the indicated maximum
level and insert it in its seating (Pic. 8.1).
Use the power cord (J) to connect the machine to the electrical mains and turn
ON the machine by pressing the ON/OFF (3) switch (Pic. 8.2). The LCC display
(13) shows the LELIT logo and the software version, the 3 buttons (1-2-4) and
the manometer light up for few seconds.
If the water tank (9), full of water, is correctly inserted in its seating, the machine
proceeds with the lling of the hydraulic circuit. If the water tank (9) is not correctly
inserted in its seating, the LCC display shows the "missing water" symbol
(Pic. 8.3).
Note. Only for the rst start-up, the machine will automatically ll the boiler
with water; during this operation some water will ow from the brewing group
for at least 40 seconds and the LELIT logo will ash on the LCC display. Let
the system nish the operation.
The hydraulic circuit will need maximum 4 minutes from the 1st turn on to get
lled with water.
Now the hydraulic circuit is lled up. The machine can start heating the water to reach
the pre-set values. On the LCC display (13) ashes the value of the water temperature
in the coffee boiler that increases up to reaching the set temperature value.

Other manuals for Lelit PL92T

Related product manuals