13
NOTE - Smooth Set Recovery and SSR STG 2
Lock Out operations vary depending on equipment
(see table 1).
SSR Stage 2 Lock Out
Default is 20 minutes. Use the + or - option to set the
number of minutes before the programmed event
time that stage 2 is allowed to operate (20 to 120
minutes in 10 minute increments). Touch < to return
to previous menu.
Contractor Information
This allows the installer to add contractor name,
address, phone, email, website and number.
Touch < to return to previous menu.
Temperature Offset
Default is 0°F. This setting can be used to offset the
displayed space temperature by up to +/- 5°F. This
offset also applies to the control temperature. Touch
< to return to previous menu.
Humidity Offset
Default is 0%. This can be used to offset the
displayed and controlled space relative humidity
(RH) by up to +/- 10% RH. Touch < to return to
previous menu.
Table 1. Smooth Set Recovery (SSR) & SSR Stage 2 Lock Out Operation
Equipment Available
When SSR is enabled then SSR
Stage 2 lock out is enabled. Can
be set between 20 and 120
minutes. Default is 20 minutes
When SSR is disabled then SSR Stg 2
lock-out setting is disabled.
Single-stage heat pump
with one or two stages
of electric backup
S Run heat pump (Y1) only
S All backup heat (W1/W2) is
enabled and SSR Stage 2
Lock Out is set between 20 -
120 minutes before the wake-
up set point.
Run heat pump (Y1) and will have
available backup heat (W1/W2) as needed.
Two-stage heat pump
with one- or two-stages
of electric backup
S Run heat pump (Y1/Y2) only.
S All backup heat (W1/W2) is
enabled and SSR Stage 2
Lock Out is set between 20 -
120 minutes before the
wake-up set point.
Run heat pump (Y1/Y2) and will have avai