EasyManua.ls Logo

Lennox CSC - Optional Operations Prior to Unit Instalation

Lennox CSC
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
• 15 •
1
3
5
2
4
6
7
3
1
2
1
2
3
2
BA BA
7
Installation, Operation and Maintenance manual • CSC/CSH-MIL153E-1217-05/2018
THE VENTILATION IS FORMED BY:
1.- Centrifugal fan ( single or double).
2.- Activating motor.
3.- Fixed pulley at the fan.
4.- Adjustable pulley at the motor fan.
5.- transmission pulley or pulleys.
6.- Base of the motor with displacement system for
tensioning of belts.
7.- Tensing screw.
FLOW REGULATION IN THE FANS
The fan in the outdoors units have a variable pulley incorporated into the activating motor, by which it is possible to vary,
when the fan is off its diameter to modify the air ow of the unit, as required.
1. Fixed part
2. Mobil part
3. Fixing screw
CLOSE PULLEY:
To increase the fan ow, turn the mobile part in
direction “B” (Clock wise).
OPEN PULLEY:
To reduce the ow, turn in direction “A”
(Unclock wise).
TENSION OF BELTS
The belts can be easily tensioned through the
tensing screw incorporated into the bases of
the motor of the transmitting units which also
enables a good servicing to be carried out.
When the tensing screw is moved, the motor
fan is moved to the sides in order to tension
the pulley.
DISPLACEMENT
SIMPLE PULLEY DOUBLE PULLEY
VARIABLE PULLEYS
2.3.- OPTIONAL OPERATIONS PRIOR TO UNIT INSTALATION
2.- INSTALLATION

Related product manuals