Installation, Operation and Maintenance manual • CSC/CSH-MIL153E-1217-05/2018
2.- INSTALLATION PAGE
3.- COMMISSIONING AND OPERATION PAGE
4.- MAINTENANCE PAGE
DATA PAGE FOR COMMISSIONING UNIT PAGE 3
TABLE OF CONTENTS
POINTS TO BEAR IN MIND PAGE 2
1.- GENERAL CHARACTERISTICS PAGE
1.1.- PHYSICAL DATA
1.2.- ELECTRICAL DATA
1.3.- OPERATING LIMITS
1.4.- FAN PERFORMANCES
1.5.- PIPING DRAWINGS
1.6.- UNIT DIMENSIONS
2.1.- PRELIMINARY PREPARATIONS
2.2.- UNIT ACCEPTANCE
2.3.- OPTIONAL OPERATIONS PRIOR TO UNIT INSTALATION
2.4.- UNIT LOCATION
2.5.- INSTALLATION CLEARANCES
2.6.- DRAINS
2.7.- REFRIGERANT CONNECTIONS
2.8.- ELECTRICAL CONNECTIONS
2.9.- OPTIONS INSTALLATION
3.1.- PRELIMINARY CHECKS BEFORE FIRST INSTALLATION
3.2.- PRELIMINARY CHECKS AT FIRST INSTALLATION
4.1.- PREVENTIVE MAINTENANCE
4.2.- CORRECTIVE MAINTENANCE
4.3.- FAILURE DIAGNOSIS
All the technical and technological information contained in this manual, including any drawing and technical descriptions
provided by us, remain the property of Lennox and must not be used (except in the operation of this product), reprodu-
ced, issued to or made available to third parties without the prior written agreement of Lennox.
The manufacturing of these units is made under the requirements of the ISO 9001 and ISO 14001.
WARNING: Read this manual before installation, reparation o maintenance works.