Page 12
Table 3
Torque Requirements
Part Recommended Torque
Service valve cap 8 ft.− lb. 11 NM
Sheet metal screws 16 in.− lb. 2 NM
Machine screws #10 28 in.− lb. 3 NM
Compressor bolts 90 in.− lb. 10 NM
Gauge port seal cap 8 ft.− lb. 11 NM
IMPORTANT
Service valves are closed to the outdoor unit and
open to line set connections. Do not open until refrig-
erant lines have been leak tested and evacuated. All
precautions should be exercised in keeping the sys-
tem free from dirt, moisture and air.
To Access Schrader Port:
1 − Remove service port cap with an adjustable wrench.
2 − Connect gauge to the service port.
3 − When testing is completed, replace service port cap.
Tighten finger tight, then an additional 1/6 turn.
To Open Service Valve:
1 − Remove stem cap using an adjustable wrench.
2 − Use a service wrench with a hex head extension to back
the stem out counterclockwise as far as it will go.
NOTE − Use a 3/16" hex head extension for liquid line
sizes or a 5/16" extension for vapor line sizes.
3 − Replace stem cap, and tighten it firmly. Tighten finger
tight, then tighten an additional 1/6 turn.
Service Valve
(Valve Closed)
Schrader valve open
to line set when valve is
closed (front seated)
service
port
service
port cap
stem cap
insert hex
wrench here
(valve front seated)
to outdoor coil
to indoor coil
Service Valve
(Valve Open)
Schrader
valve
service
port
service port
cap
insert hex
wrench here
to indoor coil
to outdoor coil
stem cap
Figure 13