EasyManuals Logo

Lennox VRF VVCA Series User Manual

Lennox VRF VVCA Series
25 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #17 background imageLoading...
Page #17 background image
17
NOTE - Each communication wire from the MS box should follow the refrigerant piping for that port.
Tightening torque for the terminal screws
Use the correct screwdriver for ghting the terminal
screws. If the screwdriver blade is too small, the head
of the screw might be damaged, and the screw will
not be properly tightened.
If the terminal screws are over tightened, screws
might be damaged.
Refer to the table below for the tightening torque of
the terminal screws.
After wiring, conrm all connections are correct; Then
turn on power supply to the unit.
Table 3. Terminal Screw Tightening Torque
Tightening torque
(lb-ft)
Terminal base of
remote controller/Signal
transmission wire (X2M)
0.58-0.72
Terminal base of power
supply (X1M)
0.87-1.06
Grounding terminal (M4) 1.06-1.43
Figure 16. Typical Communication Wiring Diagram (VRF Heat Recovery System)
Install a terminating resistor at terminals P and Q for each individual unit
when connected directly to an MS Box port.
P Q
All shields of shielded cable connect to GROUND terminal,
not to terminal E.
18 GA., stranded, 3-conductor, shielded control wire (polarity sensitive).
Typical Wiring Diagram, NEC/CEC and Local Codes apply.
Outdoor Unit
(Main Unit)
Outdoor Unit
(Sub1 Unit)
Outdoor Unit
(Sub2 Unit)
(H1H2E)(H1H2E)(H1H2E)
(PQE)
(PQE)(PQE)
(PQE)
(PQE) (PQE)
(PQE)
(PQE)
(PQE) (PQE)
(PQE)
Ground cable shield
DO NOT connect to E
Mode
Selection
Box
Mode
Selection
Box

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lennox VRF VVCA Series and is the answer not in the manual?

Lennox VRF VVCA Series Specifications

General IconGeneral
BrandLennox
ModelVRF VVCA Series
CategoryAir Handlers
LanguageEnglish

Related product manuals