EasyManua.ls Logo

Lenze 9400 Series - Page 52

Lenze 9400 Series
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Wiring the installation backplane
Wiring
Connecting busbars
5
52
EDK94ZPP0364 ZH/EN 2.0
Proceed as follows to connect the busbars:
1. If devices of the interconnected system have already been in operation:
Ensure that the power supply system is switched off by checking the
voltage at the supply terminals.
If necessary, switch off the power supply and wait at least 3 minutes.
2. Loosen the busbar screws but do not remove them completely.
3. Push the busbars as far as possible to the left towards the adjacent
busbar.
Ensure that there is good contact to the adjacent busbar.
4. Tighten the busbar screws.
Tightening torque: 3.2 ... 3.5 Nm (28 ... 31 lb-in).
5. Screw all components onto the mounting plate.
Tightening torque: 3.4 Nm (30 lb-in).

Other manuals for Lenze 9400 Series

Related product manuals