Commissioning
Before switching on
7
EDK82ZAFPC−001 DE/EN/FR 7.0
59
H1inbet−bevor
7 Commissioning
Before switching on
Stop!
Before switching on the standard device with the function module for the first
time, check...
ƒ the entire wiring for completeness, short circuit, and earth fault.
ƒ whether the integrated bus terminating resistor is activated at the first
and last physical node (64).