EasyManua.ls Logo

LG 47LW6500 - Perform GND & Internal Pressure Auto-Check; Checkpoint

LG 47LW6500
117 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LGE LCD Division LG(51)
Establish:
Reform:
LC12C Adjust Specification
LG Electronics
(If loose, re-insert)
2) Perform GND & Internal Pressure auto-check
- Unit fully inserted Power cord, Antenna cable and A/V arrive to the auto-check process.
- Connect D-terminal to AV JACK TESTER
- Auto CONTROLLER(GWS103-4) ON
- Perform GND TEST
- If NG, Buzzer will sound to inform the operator.
- If OK, changeover to I/P check automatically.
(Remove CORD, A/V form AV JACK BOX)
- Perform I/P test
- If NG, Buzzer will sound to inform the operator.
- If OK, Good lamp will lit up and the stopper will allow the pallet to move on to next process.
6.2 Checkpoint
â–ª TEST voltage
- GND: 1.5KV/min at 100mA
- SIGNAL: 3KV/min at 100mA
â–ª TEST time: 1 second
â–ª TEST POINT
- GND TEST = POWER CORD GND & SIGNAL CABLE METAL GND
- Internal Pressure TEST = POWER CORD GND & LIVE & NEUTRAL
â–ª LEAKAGE CURRENT: At 0.5mArms
7. Audio
No Item Min Typ Max Unit Remark
9.0 10.0 12.0 W
1.
Audio practical max
Output, L/R
(Distortion=10%
max Output)
8.5 8.9 9.8 Vrm
s
EQ Off
AVL Off
Clear Voice
Off
2.
Speaker (8Ω
Impedance)
10.0 15.0 W EQ On
AVL On
Clear Voice
On