118
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
LG Air-Cooled Cooling Only Inverter Scroll Chiller Installation and Owners Manual
WATER SYSTEM MAINTENANCE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Product operation status
Heat exchanger cleaning
Strainer cleaning
Water quality inspection
Refrigerant leakage inspection
Inspection
category
Period
(year)
Note:
• The above inspection table sets the minimum period, and more frequent inspections are neces-
sary according to installation environment, operation condition / water quality condition.
• During the heat exchanger cleaning, you have to take off the parts such as pressure gauge or
lock the valve so that chemical solvent may not enter.
• During the cleaning, check the pipe connection parts in advance to prevent leakage of the chem-
ical solvent.
• Start the cleaning work after the chemical solvent and water are sufficiently mixed.
• It is better to perform the heat exchanger cleaning work in the early stage, and when the scale
accumulation becomes severe, it becomes difficult to remove them.
• In the region with poor water quality, periodical cleaning works are necessary.
• Chemical solvent has strong acidic property, so it shall be completely washed with water.
• To verify if the inside became clean, remove the hose and check inside the pipe.
• Make sure to perform the air purge to remove air inside water pipe.
• After the inspection, make sure to check if the heat source water properly flows before restart-
ing the product.