EasyManua.ls Logo

LG HM031M - Test Run

LG HM031M
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8. Test Run
Air-to-Water Heat Pump _ 18
Part 2. Desing and installation
• Before starting operation, pre-check points are described in this chapter.
8.1 Test run flow chart
Is cold water discharged for
more than 3 minutes ?
START
Operation mode change
to Heating mode
Operate the unit in heating mode.
Does Test operation start?
Check whether the power cable and
communication cable are completely connected
Yes
No
Yes
No
Is hot water discharged ?
Yes
No
Is there any temperature
difference between intake and
discharged water?
No
Yes
Normal
* Check the load (In/Out Temp.)
* Check pipe length and amount of
refrigerant
* Check for abnormal sound in
* Refer to Troubleshooting Guide
outdoor unit (comp.,Fan, others )

Related product manuals