EasyManuals Logo

LG MULTI V ARNU09GSBL4 User Manual

LG MULTI V ARNU09GSBL4
520 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #435 background imageLoading...
Page #435 background image
Indoor unit
10. Installation
ARTCOOL (Mirror) _ 23
Indoor Units
• Please read this instruction sheet completely before installing the product.
• When the power cord is damaged, replacement work shall be performed by authorized personnel only.
• Installation work must be performed in accordance with the national wiring standards by authorized personnel only.
Installation Parts Provided
1. Installation Plate
2. Type “A” screws
3. Type “B” screws
Required Parts Required Tools
o Installation plate
o Five type "A" screws
o Two type “B” screws
o Connecting cable
o Level gauge
o Screw driver
o Electric drill
o Hole core drill
o Pipes: Gas side
Liquid side
o Insulation materials
o Additional drain pipe o Flaring tool set
o Specified torque wrenches
o Spanner......................................................Half union
o A glass of water
o Screw driver
o Thermometer

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LG MULTI V ARNU09GSBL4 and is the answer not in the manual?

LG MULTI V ARNU09GSBL4 Specifications

General IconGeneral
BrandLG
ModelMULTI V ARNU09GSBL4
CategoryAir Conditioner
LanguageEnglish

Related product manuals