EasyManua.ls Logo

LGMG AS0607 - Chapter 6 - Inspection Before Operation; Inspection for Operation

Default Icon
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
USER MANUAL - SS0407E / SS0507E / SS0607E / AS0607 / AS0607W / AS0607WE / AS0607E / AS0608 / AS0608E
29
Chapter 6 - Inspection before operation
6.1 Prohibited from operating unless
The safety principles of the machine are understood and implemented.
1) Dangerous circumstances are avoided.
2) An inspection is always carried out before operation.
3) The workstation has been checked.
4) A function test is always carried out before use.
5) The machine is used for its designed purpose.
6.2 Basic principles
1) Inspection for operation and routine maintenance are the responsibility of the operator.
2) Inspection for operation is a visual process, which must be carried out for each work period by the operator.
The purpose of the inspection is to check whether the machine has problems performing the function test.
3) The inspection for operation can also be used to conrm whether routine maintenance is necessary.
The operator only performs the routine maintenance items specied in this manual.
4) Check the list on the next page and check each item.
5) If damage is discovered or an unauthorised change other than the delivery status is found, then make a note
of this and stop operating the machine.
6) Only qualied service technicians may repair the machine according to the regulations of the manufacturer.
After maintenance, the operator must perform the inspection for operation again for the function test.
6.3 Inspection for operation
1) Make sure the manual is complete and legible. Keep this manual in the document box of the platform.
2) Keep all labels clear and legible and place them correctly. Go through the contents of the label.
3) Check for leakage of hydraulic oil and that the oil level is correct. Go through the contents of the label.
4) Check if there is any leakage of electrolyte and if the uid level is correct. If necessary, add the distilled
water.
5) Check if the following components or areas are damaged, if the installation is correct, if any parts are lost,
and if there is an unauthorised change.
Electrical element, wiring and cable
Hydraulic hose, control, hydraulic cylinder and hydraulic valve
Batteries and their connection
Propulsion engine/engine
Abrasion-resistant sliding block and liner
Tyre and wheel
Static conductive belt
Limit switch, alarm and horn
Nut, bolt and other fasteners
Platform overload component
Platform entrance door
Indicator light and alarm
Safety support
Extended platform
Arm scissors and fastener

Other manuals for LGMG AS0607

Related product manuals