Chapter 6 - Inspection before operation
Platform control lever
Brake release component
Exit protector
6) Check the complete machine for:
weld connection or crack of the structural element
Corrosion or damage to machine
Keep all construction elements and other important parts complete, keep the corresponding fasteners and
pins in the correct position and attach them.
Install the protective rail, place the protective rail pen in the correct position and tighten the bolts.
Keep the chassis battery drawer and oil pump drawer closed and locked, and connect the battery correctly.
Notice: If the machine is to be checked when lifting the platform, keep the
safety support in the correct position. See "Operation Notice".