USER MANUAL - SS0407E / SS0507E / SS0607E / AS0607 / AS0607W / AS0607WE / AS0607E / AS0608 / AS0608E
41
Chapter 11 - Maintenance
11.3 Hydraulic oil level inspection
The appropriate hydraulic oil level is essential for machine operation. If the hydraulic oil level is incorrect, the
hydraulic component may be damaged. The hydraulic oil level can be determined by the inspector through the daily
inspection. This change may indicate the problem of the hydraulic system.
Notice: This process must be performed when the platform is collapsed.
1) Visually inspect the uid level of the hydraulic oil tank.
Result: the hydraulic oil must be on the mark of the oil tank.
2) Add the hydraulic oil according to demand and do not add excessive hydraulic oil.
Specication of hydraulic oil: LHV32
11.4 Preparation report for delivery
1) The delivery of the preparatory report must contain the inspection items of each type.
2) The preparation report must be prepared for each inspection.
This report should be retained as required after completion.
11.5 Maintenance schedule
The daily, quarterly, six-monthly and bi-yearly maintenance must be carried out according to the schedule. The
product maintenance program and the delivery of the preparatory report can be divided into A, B, C, D and E
subitems. The steps of each inspection are shown in the table below.
11.6 Maintenance and inspection report
1) The maintenance and inspection report must contain the inspection items of each type.
2) The maintenance and inspection report must be prepared before each inspection. Save the report for at least
until 4 years after the inspection or keep it as specied by the owner and laws and of the workstation and
government.
11.7 Preparation report for delivery
Basic principles
1) The distributor is responsible for the preparation for the delivery.
2) Priority should be given to preparation for each product delivery. This inspection is aimed at nding important
problems of the equipment for use.
3) It is forbidden to use damaged or modied equipment. As soon as there is damage to or an irregularity is
found in the equipment, mark the machine immediately and stop working
4) The equipment must be repaired by the authorised mechanic according to the specication of the
manufacturer and the requirements of this manual.
Inspection cycle
Every day or every 8 hours
Every quarter or every 250 hours
Every six months or every 500 hours
Every year or every 1000 hours
Every two years or every 2000 hours
Inspection item
A
A + B
A + B + C
A + B + C + D
A + B +C + D + E