TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
SEC
5.7
AKQ
While squeezing both Triggers (AMN), insert the notched end of the
Inner Channel (AKQ) into the Outer Tube (ALB) as shown. Slide the Inner
Channel into the Outer Tube until the 10’ mark has been reached.
Then release the Trigger so it clicks into place.
ALB
AKQ
ALB
10’
SEC
5.8
Insert the #HANNEL3TOP!*3 into the top of the Outer Tube (ALB) as shown.
./4//,3/2(!2$7!2%2%15)2%$&/24()30!'%
ALB
!*3
AMN