EasyManua.ls Logo

Loctite 97102 - Dispensing; First Operation; Priming the Feed Line

Loctite 97102
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation4
4.4 Connecting the Unit
90–260 VAC/47–63 Hz
2 AM
XS1
XS1: Start
XS2: Reservoir
Loctite (Ireland) Ltd.
Made in Germany
cat.no.97102
XS2
5.1 First Operation
5.1.1 Priming the Feed Line
Check that the product reservoir, the dispensing valve and the Footswitch are connected correctly
according to their instruction manuals.
To avoid air bubbles during dispensing, the product line must be filled and then purged of air.
Position the dispensing valve as specified in its instruction manual to ensure bubble-free filling of the
product line.
Place a container under the dispensing valve since the product will flow out.
Switch the power switch 7 to the position I (ON).
With the pressure regulator 8, set the
dispensing pressure to 0.50 bar
(approx. 7.00 psi).
Press button until the product flows free of
bubbles from the dispensing needle.
For viscous products, increase the pressure
slowly in steps until the product flows out.
Hold the dispensing valve pointing downward
to prevent uncontrolled squirting out of the product.
Dispensing5
R
CONT
bar
psi
97102
CONT
bar
psi
37

Table of Contents

Related product manuals