EasyManuals Logo

Lonking CDM816D User Manual

Lonking CDM816D
89 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #34 background imageLoading...
Page #34 background image
CDM816D WHEEL LOADER
31
Fig. 2-3 Working device control
II. New vehicle running-in
The new vehicle must first undergo a running-in period and during this period, use and maintenance
shall be paid attention to according to the following specifications.
(i) Notes on new vehicle running-in
1. The new loader shall be subject to a running-in period for a total of 12 hours in a manner of two
forward gears and two reverse gears applied uniformly.
2. During the running-in period, the loading/unloading load shall not exceed 70% of the rated load.
3. Pay attention to the lubrication conditions and change or add grease at the specified time.
Stop
Release
Fig.2-2 Hand brake control
Floating
Lowering
Boom control lever in
neutral position
Lifting
Bucket tilting
forward
Tilt control lever in
neutral position
Bucket tilting
backward

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lonking CDM816D and is the answer not in the manual?

Lonking CDM816D Specifications

General IconGeneral
BrandLonking
ModelCDM816D
CategoryFront End Loaders
LanguageEnglish

Related product manuals