Installation ProtoMat S
42 HB V0.9/Mrz-11 © 2011 LPKF AG
5
5.2 Unpacking the device
ATTENTION
Risk of injury!
The machine is heavy and bulky and cannot be transported or
lifted by one person!
Lift and transport the machine with two persons.
NOTE
The graphic unpacking instruction is to be found in the covering
box. After having removed the cover of the box you can take the
unpacking instruction and proceed as described.
■
Unpacking the circuit board plotter
1. Transport the euro pallet with a lift truck to the work desk.
2. Remove the adhesive tape from the box cover.
3. Lift the paper cover from the box.
4. Take the unpacking instruction and follow the instructions step by step.
♦ Now the circuit board plotter is unpacked and ready for installation.
Pos: 18 /ED_Technisc he_Dokumentation/2_Be dienungsanleitun g/Maschine/RP_Fräsb ohrplotter/Pr otoMat_S_Serie/Pr otoMat_S_Serie_II G/Kapitel_5_Inst allation_Inbetriebn ahme/5_3_Montage_u nd_Inbetriebnah me @ 0\mod_1254753952922_ 2058.docx @ 3643 @ 23443
5.3 Installation and commissioning
Note
Prerequisite for installation and start of operation is that the PC
and the dust extraction are available at the work place. PC and
dust extraction must be ready for operation.
Note
The control software CircuitPro has to be installed on the PC.
5.3.1 Installation
The installation of the circuit board plotter must be done in four steps:
I. Removal of the transport locks
II. Connection of the mains cable
III. Connection of the dust extraction
IV. Connection of the PC