Unpacking
1.Before unpacking the breaker, check that all boxes and packing are in good condition.
2.While unpacking, check the breaker is in good condition.
3.Check that the information given on the rating /accessory nameplates corresponds to the purchase order.
4.Care about the unpacking to avoid damaging the products. Unpacking them attentively to avoid dropping
the products from carrying components and pallets.
5.Install the products to the final installation place after unpacking as soon as possible. If you cannot install
the products immediately, you had better not unpacking them. Keep the products indoor around 15 and
under 50% of humidity. Standard packing condition for domestic portage is not suited to outdoor storage.
If you cannot keep the maintenance above, you should inspect a degree of the damages before you install
the products. Unsuitable keeping does not guarantee good qualities of the products and could occur
additional danger of an accident.
2
(Under 4000AF 4P)
3
(Under 2000AF
Under 4000AF 3P)
1
(Under 6300AF)
Receiving
A visual inspection inside and out should be performed immediately upon receipt of the ACB
and before removing it from the truck. Shipping papers should be checked to ensure all boxes or
other accompanying pieces have been received. If any damage or shortages are evident, a claim should be
filed at once with the carrier, and the nearest LSIS sales office. Claims for shortages or other errors must be
made in writing to LSIS within 30 days after receipt of ACB. Failure to do so constitutes unqualified
acceptance and a waiver of all such claims by the purchaser.