4-2
CDA3000 Operation Manual
4 Commissioning
4.2 Standard
commissioning
This mode of commissioning is based on the factory setting.
Precondition:
• Inverter module is fully connected.
• Recommended IEC standard motor (see section A.2) is connected.
• Control terminals are wired as per terminal assignment 1,
see page 3-13.
Attention: Make sure that the rotating drive of your machine cannot
cause any damage during commissioning (such as by
overshooting a stop limit) and that there are no personnel
inside the danger zone.
.
Note: If the connected IEC standard motor differs by more than two
power classes from the rated power output of the inverter
module, “D
RIVEMANAGER commissioning” with automatic
motor identification should be carried out, see section 4.4.
The same applies to commissioning of special motors such
as reluctance, synchronous or HF motors. Please consult
your project engineer.
Step Action Note
1
Connect the mains power supply to
the inverter module.
After power-on, inverter module
performs a self-test (lasting approx.
1... 3 s).
2
Check that your drive can be run at
the factory set (FS) rotating field
frequency and ramps.
Quick jog = 50 Hz
Slow jog = 20 Hz
Acceleration ramp
1)
Deceleration and stop ramp
1)
3
Close ENPO contact. Enables power stage.
4
Set drive to slow jog Close S1 = slow jog
5
Start drive by closing STL or STR
contact.
STL = start anti-clockwise
STR = start clockwise
6
Check direction of rotation of motor
shaft
see section 4.5 “Direction check”
7
Brake drive by opening start
contact.
Drive brakes down to standstill.
Open ENPO contact. Safely disables power stage.
Commissioning is completed.
Start drive
1) Factory setting from BG1 to BG5
(15 kW) = 20 Hz/s, from BG6
(22 kW) to BG8 = 5 Hz/s