CDA3000 Operation Manual
A-15
DE
EN
FR
IT
ES
FR
1
2
3
4
5
A
Attention: The inverter modules can typically be overloaded with 1.5 x
I
N
for 60 s (1.8 x I
N
for 30 s). The effective inverter capacity
utilization (I
eff.
≤ I
N
) must never be greater than I
N
(rated
current).
Minimum cross-section of the grounding lead to DIN VDE 0100
Part 540
A.8 Layouts of all
sizes
Cross-section PE mains connection
Mains power cable
<10 mm²
Grounding lead (PE) cross section of at least 10 mm² or lay a
second electrical conductor parallel to the existing grounding
lead, because the operational leakage current is > 3.5 mA.
Mains power cable
>10 mm²
PE conductor with cross-section of mains power cable - see
VDE 0100 Part 540
Table A.4 Minimum cross-section of the grounding lead
Figure A.1 Layout of CDA3000 inverter module, sizes 1 to 5
L-
L2
L+
RB
L1
L3
U
V
W
X4
X2
X3
ACHTUNG
Kondensatorent-
ladezeit >3 Min.
Betriebsanleitung
beachten!
WARNING
capacitor disscharge
time >3 minutes.
Pay attention to the
operation manual!
ATTENTION
temps de decharge
du condensteur
>3 min. observer le
mode dèmploi!
!
X7
X6
H1 H2 H3
X1
X2
X3
X4
X1
L3
U
V
W
L+
RB
L-
L1
L2
ACHTUNG
Kondensatorent-
ladezeit >3 Min.
Betriebsanleitung
beachten!
WARNING
capacitor disscharge
time >3 minutes.
Pay attention to the
operation manual!
ATTENTION
temps de decharge
du condensteur
>3 min. observer le
mode dèmploi!
!
X7
X6
H1 H2 H3
X7
X6
H1 H2 H3
X4
X2
X1
X3
ACHTUNG
Kondensatorent-
ladezeit >3 Min.
Betriebsanleitung
beachten!
WARNING
capacitor disscharge
time >3 minutes.
Pay attention to the
operation manual!
ATTENTION
temps de decharge
du condensteur
>3 min. observer le
mode dèmploi!
!
BG1+2
BG3+4
L3
U
V
W
L+
RB
L-
L1
L2
L3
U
V
W
L+
RB
L-
N
CDA32.XXX
CDA34.XXX
BG5